摘要 |
<p>Docket No. PKOA-14008-PCT A management system includes an input device provided to a loading machine that performs, after a first loading work of loading a load onto a first haul machine positioned 5 at a first loading position at a loading site of a mine is ended, a second loading work of loading a load onto a second haul machine that is already positioned, during the first loading work, at a second loading position different from the first loading position, and a processing device to 10 which an operation signal generated by the input device is to be output, wherein the processing device specifies a start time of the second loading work based on the operation signal generated by the input device at a time when the first loading work is ended.</p> |