发明名称 |
METHOD FOR PLASTERING CONSTRUCTION IN ARCHITECTURAL DECORATION |
摘要 |
A method for plastering construction in architectural decoration comprises the following steps: (1) base treatment; (2) performing construction positioning paying-off according to the required plastering height, and longitudinally installing screeding templates along a wall surface subjected to the base treatment in Step (1) according to the paying-off height, a lateral space between adjacent screeding templates being 1.3 to 1.8 meters; (3) plastering; and (4) laying aside the wall surface subjected to the plastering for 12 to 24 hours till plastering mortar on the wall surface is in a half-dried compact hardened state, and using teeth of a saw blade for grinding the mortar along the two adjacent screeding templates through a ruler till the mortar is even. The method can improve the construction efficiency and guarantee the construction quality. |
申请公布号 |
US2015059284(A1) |
申请公布日期 |
2015.03.05 |
申请号 |
US201214395792 |
申请日期 |
2012.11.02 |
申请人 |
SHENZHEN GRANDLAND DECORATION GROUP CO., LTD. |
发明人 |
Li Shaoqiang;Zeng Xiaozhen;Pang Huiyuan |
分类号 |
E04F13/04;E04F21/16;E04F21/08 |
主分类号 |
E04F13/04 |
代理机构 |
|
代理人 |
|
主权项 |
1. A method for plastering construction in architectural decoration, comprising steps of:
(1) base treatment; (2) screed strip constructing; (3) plastering; and (4) wall surface grinding; the step (2) of screed strip constructing comprises: positioning alignment wires according to an intended height of applied plaster, and installing longitudinally screed templates along a wall surface treated by the step (1) of base treatment according to a distance between the alignment wire and the wall surface, wherein a transverse interval between the adjacent screed templates is 1.3 m to 1.8 m; and the step (4) of wall surface grinding comprises that: the wall surface treated by the step (3) of plastering rests for 12 hours to 24 hours till the plastered mortar on the wall surface is semi-dry and compact and at a solidified state, and the mortar is ground to be flat by saw teeth of a running rule with saw blade abutting against the mortar along two adjacent screed templates. |
地址 |
Guangdong CN |