摘要 |
<p>An automatic batch sequence computer control system is configured to automatically operate process valves in a delayed coker for a complete coke drum cycle. Double verification of the movement of the process valves is used to confirm advancing to the next step. Primary verification is achieved by using position sensors on the valves. Secondary verification is achieved by using monitored process conditions and confirming the measured conditions correlate with expected process conditions for an arrangement of valve positions at a given sequence in the coke drum cycle. A safety interlock system may be integrated with the control system.</p> |