摘要 |
<p><P>PROBLEM TO BE SOLVED: To provide roof greening equipment to which a greening unit is laid easily and stably regardless of the width of a mountain part and a valley part even when a projecting part projecting from the top surface of the mountain part exists. <P>SOLUTION: The roof greening equipment is structured as follows: laying a base material 5 where a protruding part 6 and a recessed part 7 are set up to be connected to each other and the protruding part 6 is higher than the height of the projecting part 4, on a folded-plate roof 1 to which a mountain part 2 and a valley part 3 are formed to be connected to each other, so that the mountain part 2 and the valley part 3, and the protruding part 6 and the recessed part 7 orthogonally intersect with each other; housing the projection part 4 in the protruding part 6; and placing a greening unit 8 on the protruding part 6 of the base material 5. <P>COPYRIGHT: (C)2011,JPO&INPIT</p> |