发明名称 LINING METHOD OF UNDERGROUND BUNKER
摘要 FIELD: mining.SUBSTANCE: first, holes are cut in rails, to which transverse planks are installed to be assembled into packs; then, assembled packs of rails are attached to the bunker surface; for that purpose, holes are drilled in transverse planks; after that, they are suspended on fasteners and fixed, and a gap between the rails and the bunker surface is filled with concrete. Anchors of spacer or screw type are used as fasteners. Packs are fixed with nuts with washers. Two packs at the point of the joint are fixed with one transverse plank that is inserted into slots. Packs are formed by alternation of rails of different standard sizes. Length of pipes is determined depending on relief of surface of the bunker.EFFECT: protection of underground bunkers made in mine rock against abrasive wear, static and dynamic loads.6 cl, 4 dwg
申请公布号 RU2542029(C1) 申请公布日期 2015.02.20
申请号 RU20140105384 申请日期 2014.02.13
申请人 OTKRYTOE AKTSIONERNOE OBSHCHESTVO "URAL'SKIJ NAUCHNO-ISSLEDOVATEL'SKIJ I PROEKTNYJ INSTITUT GALURGII" (OAO "GALURGIJA") 发明人 ROMANOVSKIJ ALEKSANDR ARKAD'EVICH
分类号 E21D13/00 主分类号 E21D13/00
代理机构 代理人
主权项
地址