摘要 |
FIELD: oil and gas industry.SUBSTANCE: method comprises backfilling of bottomhole, test forcing of fracturing fluid and pile of fracturing fluid with proppant, correcting the fracturing project and performing of the main fracturing process. Proppant wastes generated in result of hydraulic fracturing are used for backfilling of bottomhole, wastes are delivered to the bottomhole by portions by explosive backfilling mud barrel with expanded lower hole.EFFECT: reduced consumption of materials for hydraulic fracturing, decreased quantity of the rubbing string round trips.1 dwg |