发明名称 Fremgangsmåde til at nedramme og forankre en piloteringspæl i jorden og piloteringspæl
摘要 <p>The method involves driving a driven pile (1) with a cross-section enlarged in the area of the pile foot (4) against the cross-section of the remaining driven pile by applying the piling impulses acting in its longitudinal direction on the pile head with the pile foot preceding into the ground. The suspension of a curable material is pressed up to the pile foot in the area at the same time in which the cross-section against the area of enlarged cross-section is tapered in the direction of the pile head by a line extending to the driven pile. Independent claims are included for the following: (1) a driven pile with a pile body formed of an H-profile; and (2) a system with a driven pile, a pile driver and a suspension pressure pump.</p>
申请公布号 DK2728070(T5) 申请公布日期 2015.02.16
申请号 DK20120190848T 申请日期 2012.10.31
申请人 AUG. PRIEN BAUUNTERNEHMUNG (GMBH & CO. KG) 发明人 KRISCHIK, MARK, DIPL. -ING.
分类号 E02D5/28;E02D7/02;E02D27/12 主分类号 E02D5/28
代理机构 代理人
主权项
地址