发明名称 PILE INSTALLATION TOOL AND PILE INSTALLATION METHOD
摘要 PROBLEM TO BE SOLVED: To restrain positional deviation of a pile inserted into an insertion hole when inserting and installing a photovoltaic power generation panel support pile into the insertion hole formed in the ground.SOLUTION: A tool 1 is used when inserting and installing the photovoltaic power generation panel support pile P into the insertion hole H formed in the ground, and comprises a tool leg part 2, a tool body 3 supported by the tool leg part 2 and a passing hole 4 formed in the tool body 3. When inserting the pile P into the insertion hole H, the tool 1 regulates an insertion amount of the pile to a normal insertion amount by locking a locking object part installed on an outer peripheral surface of the pile P in a state of becoming a horizontal plane on an upper end surface of an annular part 5 for surrounding the passing hole 4 in the tool body 3 when reaching the predetermined depth by passing the pile P through the passing hole 4 positioned above the insertion hole H.
申请公布号 JP2015031037(A) 申请公布日期 2015.02.16
申请号 JP20130160661 申请日期 2013.08.01
申请人 DAIWA HOUSE INDUSTRY CO LTD 发明人 MINAMINO TAKAHIRO
分类号 E02D27/00;E02D5/28 主分类号 E02D27/00
代理机构 代理人
主权项
地址