摘要 |
<p>A method for handling a hydro sound absorber in the region of an offshore construction site. The method includes, prior to beginning noise-emitting work, positioning a hydro sound absorber in the region of the offshore construction site. The method includes positioning a transport housing receiving the hydro sound absorber close to at least one of a seabed or a surface of the water. The method also includes spreading out the hydro sound absorber from a first functional position out of the transport housing at least one of vertically to the extent of the offshore construction site or horizontally to the geometry of the seabed.</p> |