摘要 |
A floating LNG plant including a first and a second converted LNG carrier each provided with a hull and at least one LNG storage tank wherein the floating LNG plant further includes: a connection structure for connecting the hull of the first and the second converted LNG carrier in order to obtain a twin-hull vessel; process equipment for LNG processing on the floating LNG plant; and a mooring system for mooring the floating LNG plant to the seabed, wherein the at least first and second converted LNG carrier each include an LNG carrier, originally provided with a plurality of LNG tanks, wherein at least one LNG tank has been deactivated and/or removed from at least one LNG carrier to create space on the floating LNG plant for installing the process equipment for LNG processing. |