摘要 |
<p>PROBLEM TO BE SOLVED: To provide a greening slope structure that can suppress the length of a reinforcement material and that enables easy execution of slope planting, and a construction method for the same.SOLUTION: A greening slope structure 30 includes: a slope section 31 that is formed by making use of ordinary earth; a fill body 32 that is formed by making use of improved earth; a plurality of slope units (slope anchorage materials) 34 that are arranged in the height direction of the slope section 31; and main and auxiliary reinforcement materials 35a and 35b which are fixed to the slope units 34, respectively, and which are arranged on the rear sides of the slope units 34, respectively.</p> |