发明名称 Construction Lifting Simulation Method and System using an Optimal B&B Algorithm
摘要 <p>The present invention relates to a simulation method using an optimal operating plan algorithm capable of increasing operating ratios for a construction lift used in super high-rise construction. The present invention provides an effect capable of enabling a user to make a decision related to more objective and systematic lift plans by improving a matrix according to the moving time of a construction lift in a B&B algorithm and simulating the lifting efficiency of the lift. [Reference numerals] (10) Construction plan;(20) Tower crane H/W spec;(40) Simulation result;(AA) Construction lift H/W spec;(BB) Library DB;(CC) Lifted load (resources)</p>
申请公布号 KR101482004(B1) 申请公布日期 2015.01.14
申请号 KR20120044419 申请日期 2012.04.27
申请人 发明人
分类号 G06F9/455;G06F19/00;G06Q50/08 主分类号 G06F9/455