发明名称 |
ENGINEERING SCHEDULE MANAGEMENT SYSTEM, ENGINEERING SCHEDULE MANAGEMENT METHOD AND ENGINEERING SCHEDULE MANAGEMENT PROGRAM |
摘要 |
PROBLEM TO BE SOLVED: To eliminate duplication of resources or works on the basis of the priority while considering limiting conditions such as order and delivery date.SOLUTION: An engineering schedule management system 10a includes: a display section 51; an engineering schedule DB41; a work input section 12 that receives inputs etc. on a work plan and a work; a resource input section 11 that receives inputs etc. on resources; a work attribute setting section 6 for setting work attributes; a work order relation setting section 7 that sets relationship among the works; a PERT execution section 21 for obtaining the float for each work; a priority evaluation section 22 that sets the priority on the basis of the work float and a predetermined evaluation function; a resources collapse execution section 23 that distributes resources to plural works; and an execution ES management section 33a that registers or updates the engineering schedule DB41 while adjusting the engineering schedule data. |
申请公布号 |
JP2015005032(A) |
申请公布日期 |
2015.01.08 |
申请号 |
JP20130128499 |
申请日期 |
2013.06.19 |
申请人 |
TOSHIBA CORP |
发明人 |
MAKISE YUICHI;MINEMURA TAKEHIRO |
分类号 |
G06Q10/10;G06Q50/04 |
主分类号 |
G06Q10/10 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|