主权项 |
1. A method of applying a load to a pile, comprising:
locating a top portion below a top section of a pile, wherein the top portion is attached to the top section of the pile; locating a bottom portion below and proximate the top portion and above a bottom section of the pile, wherein the bottom portion is attached to the bottom section of the pile, wherein at least a portion of the cross-section of the top portion and at least a portion of the cross-section of the bottom portion is open, and wherein the top section of the pile and the bottom section of the pile are contiguous through the open portion of the cross-section of the top portion and the open portion of the cross-section of the bottom portion; injecting a fluid between the top portion and the bottom portion, such that the top portion and the bottom portion are pushed apart, the top portion pushes up on the top section of the pile, the bottom portion pushes down on the bottom section of the pile, and at least one void is created between the top section of the pile and the bottom section of the pile in a portion of the pile extending through the open portion of the cross-section of the top portion and the open portion of the cross-section of the bottom portion, wherein once the at least one void is created the fluid fills at least a portion of one or more of the at least one void. |