发明名称 A SYSTEM FOR MONITORING THE QUALITY OF EXECUTION OF EXCAVATED PILES AND TUNNEL BORES
摘要 <p>The present invention relates to a system, the basic purpose of which is the monitoring of the energy of execution, in the form of work performed or of the energy required, for excavating each pile of the piling, executed with equipment of the mechanical boring machine or monitored continuous worm type, or simply of the torque, for monitoring quality, not only in the execution process per se but also in terms of the individual load capacity of each pile, with particular application to deep foundations. In the case of tunnel boring, the system allows the establishment of critical zones in terms of the excavation and the definition of adjustments of execution and design. The system is characterized basically by monitoring of the piling being based on the specification of the equipment, with respect to the hydraulic motors, the dimensions of the worm and the ratio of the gears, the torque of the equipment for determining the critical boring speed and, furthermore, the system monitors data on the flow and pressure of the concrete, the hydraulic pressure of the system, and the depth and critical speed of concreting, defining the amount of energy required to excavate a pile.</p>
申请公布号 WO2014205527(A1) 申请公布日期 2014.12.31
申请号 WO2013BR00235 申请日期 2013.06.24
申请人 SCCAP ENGENHARIA LTDA 发明人 SILVA, CARLOS MEDEIROS;VAN NEWTON PAOLUCCI, HOOVER;DE CARVALHO, JOSÉ CAMAPUM
分类号 E02D7/22;E02D5/36;E21B44/00 主分类号 E02D7/22
代理机构 代理人
主权项
地址