发明名称 |
Optimizing well operating plans |
摘要 |
Methods and systems for making decisions related to the operation of a hydrocarbon well include characterizing effective production capacity of a reservoir over space and time based at least in part on a reservoir potential and a near-well capacity; determining an optimized well potential over space and time relative to the characterized effective production capacity using a well model of a simulated well accessing the reservoir, which may be determined based at least in part on an objective function that considers at least one of a plurality of decision-making factors, such as one or more of operations costs, operational risks, and modeled production rates over the life of the well; and determining at least one well operating plan component that can be incorporated into a well operating plan to provide the optimized well potential in a well accessing the reservoir. |
申请公布号 |
US8914268(B2) |
申请公布日期 |
2014.12.16 |
申请号 |
US201013133895 |
申请日期 |
2010.01.05 |
申请人 |
ExxonMobil Upstream Research Company |
发明人 |
Dale Bruce A.;Ellison Timothy K.;Postl Dieter;Chang Dar-Lon;Hommema Jennifer |
分类号 |
G06G7/58;E21B43/00 |
主分类号 |
G06G7/58 |
代理机构 |
ExxonMobil Upstream Research Company—Law Department |
代理人 |
ExxonMobil Upstream Research Company—Law Department |
主权项 |
1. A method for hydrocarbon well decision-making, the method comprising:
characterizing reservoir potential of a reservoir over space and time using a reservoir model; characterizing a near-well capacity of a formation adjacent to a well drilled to access the reservoir using a near-well model of a simulated well accessing the reservoir, the near-well model considering effects on the formation over time and space due to at least one of particulate movement, filter-cake presence, and scale build-up, wherein the near-well capacity comprises a capacity of the formation adjacent to the well to flow fluids without one of triggering and initiating a negative production event; characterizing an effective production capacity based at least in part on the characterized reservoir potential as modified by the characterized near-well capacity; determining an optimized well potential over space and time relative to the characterized effective production capacity using a well model; and determining at least one well operating plan component that can be incorporated into a well operating plan to provide the determined optimized well potential in a well accessing the reservoir. |
地址 |
Houston TX US |