发明名称 |
METHOD AND SYSTEM FOR DISPLAYING WORK ASSIGNMENT STATUS INFORMATION IN CONNECTION WITH WORK TO BE PERFORMED ON A COMPONENT OF A LINEAR ASSET INFRASTRUCTURE |
摘要 |
The invention provides a graphical user interface implemented on a computer including an information area for displaying to a user at the computer inspection status information in connection with one or more components of a linear asset infrastructure. The graphical user interface also includes a control component operable by the user at the computer to cause the graphical user interface to display additional information on the one or more components of the linear asset infrastructure. |
申请公布号 |
US2014365260(A1) |
申请公布日期 |
2014.12.11 |
申请号 |
US201414466510 |
申请日期 |
2014.08.22 |
申请人 |
Canadian National Railway Company |
发明人 |
Tays Dwight;Lilley David;Abbott Brian |
分类号 |
G06Q10/06;G06F3/0482 |
主分类号 |
G06Q10/06 |
代理机构 |
|
代理人 |
|
主权项 |
1. A method for performing maintenance on a railway infrastructure having components selected from the group consisting of track segments and features, the method including:
a) performing an in-field inspection of track segments of the railway infrastructure to determine if the track segments are fit for continued service, the inspection including a visual inspection of the track segments by an inspector; b) providing the inspector with a portable computing device having a first display; c) when the in-field inspection of a first track segment determines that the first track segment manifests a condition that represents a deviation from an operational requirement, producing a condition record, the producing of the condition record including:
i) rendering a first graphical user interface on the first display, the graphical user interface having:
1) a first data input field configured to receive information identifying the condition observed in connection with the first track segment;2) a second data input field configured to hold information describing a maintenance activity to be performed to rectify the condition observed in connection with the first track segment;3) a third data input field configured to hold information describing a temporary remedial action defining a change in an operational procedure affecting train traffic over the first track segment to be implemented before the maintenance activity to rectify the first condition is completed;ii) providing a database for storing condition records and maintenance activity records associated with components of the railway infrastructure that have been identified via in-field inspections as manifesting conditions that represent deviations from the operational requirements of the components;iii) electronically transmitting the information in the first and second data input fields to the database and creating in the database a new condition record and a new maintenance activity record in connection with the first track segment at least in part on the basis of the information in the first and second data input fields; d) driving a work list indicator in a second graphical user interface rendered on a second display that is remote from the first display on the basis of the maintenance activity records stored in the database, the work list indicator:
i) showing a list of maintenance activities associated with different components of the railway infrastructure against which condition records have been recorded, the maintenance activities are characterized by respective levels of urgency;ii) distinguishing the maintenance activities on the basis of the respective levels of urgency; e) implementing the temporary remedial action in the third data input field in connection with rail traffic over the first track segment; f) performing the maintenance activities in the list according to a sequence corresponding to the respective levels of urgency; g) when the maintenance activity in connection with the first track segment is completed and the first condition rectified, lifting the temporary remedial action. |
地址 |
Montreal CA |