发明名称 BOOM CYLINDER CONTROL CIRCUIT FOR CONSTRUCTION MACHINE
摘要 The present disclosure relates to a boom cylinder control circuit for a construction machine, and includes: a boom cylinder which has an ascending-side chamber and a descending-side chamber; a boom control unit which provides a working fluid to the boom cylinder; a boom operation part which is operated to drive the boom cylinder by providing a pilot working fluid to the boom control unit; a first floating valve which allows the descending-side chamber and the ascending-side chamber to selectively communicate with or be shut off from a first drain line; a second floating valve which is additionally provided in a flow path between the descending-side chamber, which is connected with the first drain line via the first floating valve, and the first drain line, allows the descending-side chamber to communicate with the first drain line, or shut off discharge of the working fluid from the descending-side chamber to the first drain line, and allows of a reverse flow; and a floating selection operation part which provides an operation signal so that the first floating valve and the second floating valve are switched in a direction in which the first floating valve and the second floating valve are communicated or shut off.
申请公布号 US2014360174(A1) 申请公布日期 2014.12.11
申请号 US201214369535 申请日期 2012.12.18
申请人 DOOSAN INFRACORE CO., LTD. 发明人 Sohn Won Sun
分类号 F15B13/04;E02F9/22;F15B13/042 主分类号 F15B13/04
代理机构 代理人
主权项 1. A boom cylinder control circuit for use with a construction machine, comprising: a boom cylinder which has an ascending-side chamber and a descending-side chamber; a boom control unit which provides a working fluid to the boom cylinder; a boom operation part which is operated to drive the boom cylinder by providing a pilot working fluid to the boom control unit; a first floating valve which allows the descending-side chamber and the ascending-side chamber to selectively communicate with or be shut off from a first drain line; a second floating valve which is additionally provided in a flow path between the descending-side chamber, which is connected with the first drain line via the first floating valve, and the first drain line, allows the descending-side chamber to communicate with the first drain line, or shut off discharge of the working fluid from the descending-side chamber to the first drain line, and allows of a reverse flow; and a floating selection operation part which provides an operation signal so that the first floating valve and the second floating valve are switched in a direction in which the first floating valve and the second floating valve are communicated or shut off.
地址 Incheon KR