发明名称 EARTH RETAINING WALL AND CONSTRUCTION METHOD FOR THE SAME
摘要 PROBLEM TO BE SOLVED: To improve workability of a soldier beam in construction of an earth retaining wall comprising the soldier beam.SOLUTION: An earth retaining wall 10 includes a plurality of soldier beams 20 that are provided at intervals, and horizontal sheathing 30 that is provided between the plurality of soldier beams 20. The soldier beam 20 is an H-shaped horizontal-section soil improvement body. In addition, the soldier beam 20 is constructed by using a construction machine, the base machine of which is a back hoe and which has a tip of an arm fitted with an agitation mixer.
申请公布号 JP2014231725(A) 申请公布日期 2014.12.11
申请号 JP20130114325 申请日期 2013.05.30
申请人 OHBAYASHI CORP 发明人 KANAI MAKOTO;YAMADA HIROSHI;OKAMOTO TOSHIHARU
分类号 E02D17/04;E02D3/12 主分类号 E02D17/04
代理机构 代理人
主权项
地址