发明名称 CONSTRUCTION METHOD OF FILLING GAP PORTION OF EARTH RETAINING WALL OF TEMPORARY FACILITY
摘要 <p>The present invention relates to a method for filling gap portions of an earth retaining wall of a temporary facility. More particularly, the present invention provides a method for filling gap portions of an earth retaining wall of a temporary facility characterized in that gaps between the earth retaining wall and waling can be easily filled; constructing and detaching operation is simplified; and members such as earth retaining wall and waling are not damaged and can be reused. The method for filling gap portions of an earth retaining wall of a temporary facility according to the present invention has advantages in that individual blocks for gaps between earth retaining wall and waling having differently spaced distances should not be fabricated; one-step installation and easy construction is possible; damages to members such as waling and strut due to unbalanced stress are avoided as the unbalanced stress is not generated; it can be extensively applied to variously shaped earth retaining walls installed by various construction methods; members such as earth retaining wall, waling, strut and the like can be reused to prevent material waste as these members are not damaged; detaching operation is simplified as one step procedure after construction is completed; and members such as waling are not damaged during the detaching operation.</p>
申请公布号 KR101471058(B1) 申请公布日期 2014.12.09
申请号 KR20140122197 申请日期 2014.09.15
申请人 KANG NAM 发明人 LEE, HAK GON;SEO, DEOK DONG
分类号 E02D17/04;E02D17/08 主分类号 E02D17/04
代理机构 代理人
主权项
地址