The present invention relates to an upper structure of a bridge and a bridge construction method thereof. The upper structure of a bridge according to the present invention includes: a girder (100) which is mounted on the upper party of a bridge shift (1) or pier (2); an end pylon (200) which is formed on a side or both ends of the girder (100); and a cable (300) which is coupled to the girder (100) and the end pylon (200) to partially deliver the load on the girder (100) to the end pylon (200). The girder (100) and the end pylon (200) are integrated together.
申请公布号
KR20140139379(A)
申请公布日期
2014.12.05
申请号
KR20130059971
申请日期
2013.05.27
申请人
SSANGYOUNG ENGINEERING & CONSTRUCTION CORPORATION
发明人
LEE, TA;MOON, YOUNG CHUL;CHO, HYUN JUN;JANG, JAE WOON