摘要 |
PROBLEM TO BE SOLVED: To provide an installation of a garbage collector which allows loading work at many stations by reducing the frequency of operation of an electric motor to a minimal level when the residual quantity of a battery decreases to equal to or smaller than a specified value, during operation of a garbage loading device driven by the electric motor in a continuous operation mode.SOLUTION: An installation of a garbage collector includes a controller UK which controls the operation of a garbage loading device 2 with an electric motor as a driving source and a loading switch CR-SW1 for starting and stopping the garbage loading device 2 arbitrarily, and the garbage loading device 2 is operable in a continuous operation mode of repeating a specified garbage loading step cycle. The controller UK executes the garbage loading step cycle specified times and then stops the operation of the garbage loading device 2 when the residual quantity of a battery decreases to equal to or smaller than a specified value, during operation of the garbage loading device 2 in the continuous operation mode. |