摘要 |
An erasable loop scheduler with a board and a loop system is disclosed. The board has a first and second side, each having a viewing pane that displays a different portion of the loop system. The loop system includes a grid system that can be configured like a calendar. A user can write out a full month of dates and appointments on the first side of the board and another full month of dates and appointments on the second side of the board. Once a row of events has passed, the loop system can be advanced, at which point the row of past events moves to the second side of the board. The user may then erase that row of events and replace with upcoming dates and appointments. Alternatively, the user may keep the row of events for future reference. |