发明名称 PROCESS FOR CONSTRUCTING IN SITU CONCRETE TUBULAR PILE APPLICABLE IN WATER AND DEDICATED DRILL FOR THE PROCESS
摘要 <p>A process for constructing an in situ concrete tubular pile applicable in a water. A tubular boot (4) is mounted at the bottom part of a tubular cavity (3). The tubular boot (4) is placed at a construction position and pressure is applied onto a force-applying press head (6). The tubular boot (4) enters a base layer at the bottom part of a water layer along with an outer wall-protecting sleeve cylinder (2) and an inner wall-protecting sleeve cylinder (1). A base medium and water extruded by the tubular boot (4) are discharged from a cavity of the inner wall-protecting sleeve cylinder (1) and a material-discharging hole (61) of the force-applying press head (6). When the tubular boot (4) completely enters a marked position of a soil layer at the bottom part of the water, concrete is injected into the tubular cavity (3) via an injection hole (21) provided on the outer wall-protecting sleeve cylinder (2). The force-applying press head (6), a press cap (5), and the inner wall-protecting sleeve cylinder (1) are pulled upwards while the injection is in progress. The injected concrete is connected together with the outer wall-protecting sleeve cylinder (2) on the outside or with an outer wall-protecting retained layer and with the tubular boot (4) at the lower end, thus forming the concrete tubular pile. Also provided is a dedicated drill applicable in the construction process.</p>
申请公布号 WO2014183449(A1) 申请公布日期 2014.11.20
申请号 WO2013CN90427 申请日期 2013.12.25
申请人 LI, SHENGNAN 发明人 LI, SHENGNAN;XIE, QINGDAO
分类号 E02D5/38;E02D5/66;E02D7/18;E02D11/00 主分类号 E02D5/38
代理机构 代理人
主权项
地址