发明名称 |
PROCESS FOR CONSTRUCTING IN SITU CONCRETE TUBULAR PILE APPLICABLE IN WATER AND DEDICATED DRILL FOR THE PROCESS |
摘要 |
<p>A process for constructing an in situ concrete tubular pile applicable in a water. A tubular boot (4) is mounted at the bottom part of a tubular cavity (3). The tubular boot (4) is placed at a construction position and pressure is applied onto a force-applying press head (6). The tubular boot (4) enters a base layer at the bottom part of a water layer along with an outer wall-protecting sleeve cylinder (2) and an inner wall-protecting sleeve cylinder (1). A base medium and water extruded by the tubular boot (4) are discharged from a cavity of the inner wall-protecting sleeve cylinder (1) and a material-discharging hole (61) of the force-applying press head (6). When the tubular boot (4) completely enters a marked position of a soil layer at the bottom part of the water, concrete is injected into the tubular cavity (3) via an injection hole (21) provided on the outer wall-protecting sleeve cylinder (2). The force-applying press head (6), a press cap (5), and the inner wall-protecting sleeve cylinder (1) are pulled upwards while the injection is in progress. The injected concrete is connected together with the outer wall-protecting sleeve cylinder (2) on the outside or with an outer wall-protecting retained layer and with the tubular boot (4) at the lower end, thus forming the concrete tubular pile. Also provided is a dedicated drill applicable in the construction process.</p> |
申请公布号 |
WO2014183449(A1) |
申请公布日期 |
2014.11.20 |
申请号 |
WO2013CN90427 |
申请日期 |
2013.12.25 |
申请人 |
LI, SHENGNAN |
发明人 |
LI, SHENGNAN;XIE, QINGDAO |
分类号 |
E02D5/38;E02D5/66;E02D7/18;E02D11/00 |
主分类号 |
E02D5/38 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|