摘要 |
<p>PROBLEM TO BE SOLVED: To provide a thermal load prediction device of a cogeneration system in which reservation change of a thermal load due to the intention of a user is correctly reflected on prediction data.SOLUTION: When at least part of reservation information is updated, at least reservation information before update and after update is stored. An operation planning device corrects the thermal load achievement stored in a first storage device on the basis of reservation operation information before update, and updates an operation plan by using the corrected thermal load achievement and reservation operation information after update.</p> |