发明名称 CUSHION BLASTING METHOD COMBINING HOLE BOTTOM DAMAGE CONTROL AND FAST EXCAVATION
摘要 Disclosed is a cushion blasting method based on a combination of hole bottom damage control and fast excavation, comprising steps: step 1. drilling in rock bodies vertical blasting holes that have collinear circle centers and are in rows; step 2. laying a cushion layer on the hole bottom of the blasting holes, the cushion layer being loose sand, rock powder or fine sand; step 3. adopting a rope to draw an energy dissipation seat to enter the blasting holes, and enabling the bottom surface of the energy dissipation seat to be placed on the cushion layer; and step 4. adding blasting powder inside the blasting holes and detonating the blasting powder after blocking it. The present invention is suitable for one-time formation of excavation for dam foundation surfaces and slope path protection layers, and has advantages such as a simple process, low cost, and a desirable excavation effect.
申请公布号 WO2014180101(A1) 申请公布日期 2014.11.13
申请号 WO2013CN86107 申请日期 2013.10.29
申请人 WUHAN UNIVERSITY 发明人 LU, WENBO;HU, YINGGUO;CHEN, MING;YAN, PENG;HU, HAORAN;ZHU, QIANG;ZHANG, YUZHU
分类号 F42D1/00;F42B1/024;F42D1/08;F42D1/18 主分类号 F42D1/00
代理机构 代理人
主权项
地址