发明名称 |
CUSHION BLASTING METHOD COMBINING HOLE BOTTOM DAMAGE CONTROL AND FAST EXCAVATION |
摘要 |
Disclosed is a cushion blasting method based on a combination of hole bottom damage control and fast excavation, comprising steps: step 1. drilling in rock bodies vertical blasting holes that have collinear circle centers and are in rows; step 2. laying a cushion layer on the hole bottom of the blasting holes, the cushion layer being loose sand, rock powder or fine sand; step 3. adopting a rope to draw an energy dissipation seat to enter the blasting holes, and enabling the bottom surface of the energy dissipation seat to be placed on the cushion layer; and step 4. adding blasting powder inside the blasting holes and detonating the blasting powder after blocking it. The present invention is suitable for one-time formation of excavation for dam foundation surfaces and slope path protection layers, and has advantages such as a simple process, low cost, and a desirable excavation effect. |
申请公布号 |
WO2014180101(A1) |
申请公布日期 |
2014.11.13 |
申请号 |
WO2013CN86107 |
申请日期 |
2013.10.29 |
申请人 |
WUHAN UNIVERSITY |
发明人 |
LU, WENBO;HU, YINGGUO;CHEN, MING;YAN, PENG;HU, HAORAN;ZHU, QIANG;ZHANG, YUZHU |
分类号 |
F42D1/00;F42B1/024;F42D1/08;F42D1/18 |
主分类号 |
F42D1/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|