发明名称 |
CONTROLLING AN ELECTRICAL CONVERTER |
摘要 |
A method, a computer-readable medium for controlling an electrical converter, and a controller are disclosed. The method for controlling an electrical converter can include receiving an actual switching state uk-1 of the electrical converter; determining a scenario tree for future switching states of the electrical converter based on the actual switching state uk-1, the scenario tree defining a plurality of future switching sequences, a switching sequence U being defined by a path from a root node of the scenario tree to a leave node of the scenario tree; calculating a weight w for a switching sequence by evaluating nodes of the scenario tree; and determining the next switching state uk to be applied to the electrical converter from a switching sequence with a best weight. The evaluation of the nodes can be performed by at least two processor cores. |
申请公布号 |
US2014334207(A1) |
申请公布日期 |
2014.11.13 |
申请号 |
US201414339223 |
申请日期 |
2014.07.23 |
申请人 |
ABB Research Ltd |
发明人 |
PEYRL Helfried;RICHTER Stefan |
分类号 |
H02M7/48 |
主分类号 |
H02M7/48 |
代理机构 |
|
代理人 |
|
主权项 |
1. A method for controlling an electrical converter, the method comprising:
receiving an actual switching state (uk-1) of the electrical converter; determining a scenario tree for future switching states of the electrical converter based on the actual switching state (uk-1), the scenario tree defining a plurality of future switching sequences, a switching sequence (U) being defined by a path from a root node of the scenario tree to a leave node of the scenario tree; calculating a weight (w) for a switching sequence with respect to a control objective of the electrical converter by evaluating nodes of the scenario tree; determining the next switching state (uk) to be applied to the electrical converter from a switching sequence with a best weight; performing the evaluation of the nodes by at least two processor cores; and determining the scenario tree by loading at least parts of the scenario tree from a pre-calculated table, wherein a calculation time of a sub-tree of the scenario tree is predefined in the table. |
地址 |
Zürich CH |