摘要 |
<p>The method involves placing cladding panels (16) on a production table under release of joints arranged next to each other in a formwork frame. Edges of the panels are pressed into strips (14) on all sides to apply a concrete layer (28) on the panels. A sealing compound present in the strips is applied on the table, where a position of the compound corresponds to a pattern of the joints. An insulating layer (34) is applied on the concrete layer. Boreholes are attached to the insulating layer to insert an anchoring rod (36) into each borehole after inserting the insulating layer into the frame.</p> |