发明名称 OPTIMIZATION CONTROL METHOD FOR REACTIVE VOLTAGE OF WIND FARM CLUSTER
摘要 <p>An optimization control method for a reactive voltage of a wind farm cluster comprises the following steps: determining whether it is required to perform optimization control on a reactive voltage of a wind farm cluster; obtaining adjusting ranges of reactive source devices of wind farms and pooling stations in a cluster area; and establishing and solving a reactive voltage optimization control mathematic model of the wind farm cluster. In the optimization control method for a reactive voltage of a wind farm cluster, a wind farm cluster access point is used as a central voltage control node, and the wind farm integration point bus voltage, the wind farm step-up substation tap, the reactive power output of a reactive compensation device of the pooling station, and the pooling station transformer tap in the cluster area are adjusted; in this way, the central node is ensured to satisfy the control instruction range of a scheduling mechanism, and the stability margin of the static voltage in the cluster area maintains at the maximum and the active power loss maintains at the minimum, thereby improving the security stability during system operation and enhancing the capability of utilization of the wind power.</p>
申请公布号 WO2014173081(A1) 申请公布日期 2014.10.30
申请号 WO2013CN84617 申请日期 2013.09.29
申请人 STATE GRID CORPORATION OF CHINA;CHINA ELECTRIC POWER RESEARCH INSTITUTE 发明人 WANG, WEISHENG;YANG, SHUO;LIU, CHUN;HUANG, YUEHUI
分类号 H02J3/16 主分类号 H02J3/16
代理机构 代理人
主权项
地址