发明名称 ISOLATION OF FORMATION FLUIDS IN WELL (VERSIONS)
摘要 FIELD: oil-and-gas industry.SUBSTANCE: proposed method comprises lowering the pipe casing and cementing its cavity, formation of cavity in preset interval and filling it with mortar. Cavity is formed by cutting of casing pipe and withdrawal from the well. Availability of impermeable baffle is defined. In case said spacing between baffle flooded and productive beds exceeds 10 m or is less than 2-3 m, casing pipe is cut by 5-6 m above bottom productive bed. In case baffle depth makes less than 2-3 m, casing pipe is cit down to productive bed bottom. Then, temporary oil-well tubing is lowered to bottom for it to be flushed and to fill in mortar in the cavity at interval from the borehole bottom to productive bed bottom. Now oil-well tubing is withdrawn from the well and, after gardening of mortar, casing string is processed to cement crust.EFFECT: higher efficiency and reliability of isolation between flooded and productive seams.2 cl, 4 dwg
申请公布号 RU2531962(C2) 申请公布日期 2014.10.27
申请号 RU20100141334 申请日期 2010.10.07
申请人 OTKRYTOE AKTSIONERNOE OBSHCHESTVO "TATNEFT'" IM. V.D. SHASHINA 发明人 RAKHMANOV AJRAT RAFKATOVICH;GALIEV TIMUR IL'DUSOVICH;ASLJAMOV AJDAR INGELEVICH;GALIMOV ZUL'FAT FAUZAROVICH
分类号 E21B33/00 主分类号 E21B33/00
代理机构 代理人
主权项
地址