发明名称 Method for assembling and transporting an offshore wind turbine
摘要 The invention relates to a method for assembly and installation of an offshore wind turbine, where components such as a nacelle comprising a shaft and a hub, one or more tower sections and/or blades are manufactured, assembled at or transported to a harbour area, where said components for one or more wind turbines are loaded onto a transport and installation vessel and subsequently transported to an erection site. The new method for assembly and installation of an offshore wind turbine comprises at least the steps of: - assembling a nacelle for a two-bladed wind turbine, where the hub at said nacelle comprises two sets of blade installation interfaces facing in a radial direction, said blade installation interfaces having a 180 degree angular distance, - installing at least one, but preferably two inner blade parts at said hub, - arranging said nacelle comprising a hub and at least one inner blade part directly or indirectly at the deck of said transport and installation vessel.
申请公布号 DK201370227(A1) 申请公布日期 2014.10.25
申请号 DK20130070227 申请日期 2013.04.24
申请人 ENVISION ENERGY (DENMARK) APS 发明人 WESTERGAARD, JAN
分类号 F03D11/00 主分类号 F03D11/00
代理机构 代理人
主权项
地址