发明名称 |
Outward power supply control apparatus for fuel cell vehicle |
摘要 |
An ECU of a control apparatus further alleviates a fluctuation in a power generation amount of a fuel cell stack with respect to the power required by an inverter apparatus, when a power supply circuit configured by each of contactors and a power supply inlet 11a supplies the power to the inverter apparatus compared with when a vehicle is driving. The ECU, when the power supply circuit supplies power to the inverter apparatus, stops the power generation of the fuel cell stack in a case where a remaining capacity in a battery is greater than or equal to a predetermined remaining capacity, and inhibits the fuel cell stack from stopping the power generation in a case where the power supplied to the inverter apparatus by the power supply circuit is greater than or equal to a predetermined power supply amount. |
申请公布号 |
US8868275(B2) |
申请公布日期 |
2014.10.21 |
申请号 |
US201313840065 |
申请日期 |
2013.03.15 |
申请人 |
Honda Motor Co., Ltd. |
发明人 |
Shirasaka Takuya;Kayano Morio;Igarashi Daishi |
分类号 |
B60L11/18;B60L1/00;B60L11/12 |
主分类号 |
B60L11/18 |
代理机构 |
Westerman, Hattori, Daniels & Adrian, LLP |
代理人 |
Westerman, Hattori, Daniels & Adrian, LLP |
主权项 |
1. An outward power supply control apparatus for a fuel cell vehicle comprising:
a fuel cell stack; an air pump configured to supply air to the fuel cell stack; an air pump motor configured to drive the air pump; an electrical storage apparatus; a drive motor driven by power from the fuel cell stack and the electrical storage apparatus; a power supply circuit configured to supply the power from the fuel cell stack and the electrical storage apparatus to an equipment outside the vehicle; and a control device comprising a power generation fluctuation limiting device configured to further alleviate a fluctuation in a power generation amount of the fuel cell stack with respect to the power required by the equipment by setting a target power generation amount of the fuel cell stack based on a primary lag value calculated by a smoothing process to the power required by the equipment, when the power supply circuit supplies the power to the equipment compared with when the vehicle is driving. |
地址 |
Tokyo JP |