发明名称 HYDROELECTRIC GENERATION PLAN ADJUSTMENT DEVICE, HYDROELECTRIC GENERATION PLAN ADJUSTMENT METHOD AND PROGRAM
摘要 <p>The economical load distribution adjusting device 10 acquires an optimal hydroelectric output, optimal demand, and unit power generation cost from the supply-demand planning device 23, acquires the planned hydroelectric output planned by the water level planning devices 21 by providing a price signal created by converting the unit power generation cost, and acquires a planned demand planned by the charge control devices 22 by similarly providing a price signal. The economical load distribution adjusting device 10 adjusts the power price of the time at which the planned hydroelectric output does not agree with the optimal output and makes the water level planning devices 21 replan the hydroelectric output by providing a price signal obtained by converting the adjusted power price, and adjusts the power price of the time at which the planned demand does not agree with the optimal demand and makes the charge control devices 22 replan the amount of demand by providing a price signal obtained by converting the adjusted power price.</p>
申请公布号 EP2790147(A1) 申请公布日期 2014.10.15
申请号 EP20110876874 申请日期 2011.12.06
申请人 THE CHUGOKU ELECTRIC POWER CO., INC. 发明人 OE, RYUJI
分类号 G06Q50/06;G06Q50/12 主分类号 G06Q50/06
代理机构 代理人
主权项
地址