发明名称 |
Refracturing method for plug and perforate wells |
摘要 |
The method of the present invention deploys controlled electrolytic material, CEM, into the existing perforations to seal them and then using a bottom hole assembly, BHA, that isolates a portion of the wellbore to deliver a material that removes the CEM at a predetermined rate so that the BHA can be used to refracture the recently opened perforation. Additional new perforations can be made and fractured during the process. |
申请公布号 |
US8857513(B2) |
申请公布日期 |
2014.10.14 |
申请号 |
US201213355134 |
申请日期 |
2012.01.20 |
申请人 |
Baker Hughes Incorporated |
发明人 |
O'Malley Edward J. |
分类号 |
E21B43/11;E21B43/26 |
主分类号 |
E21B43/11 |
代理机构 |
|
代理人 |
Rosenblatt Steve |
主权项 |
1. A method of re-fracturing a well, comprising: plugging existing perforations with a controlled electrolytic material, CEM; sequentially chemically or thermally removing the CEM at said existing perforations; refracturing said existing perforations after said removing. |
地址 |
Houston TX US |