发明名称 |
SHIP AND SHIP OPERATING METHOD |
摘要 |
<p>The present invention relates to a ship. The ship according to an embodiment of the present invention comprises: a hull having a storage part on which a pipe-shaped drilling device is loaded, and an upper deck for covering the upper part of the storage part; a shielding unit for closing an opening formed on the upper deck in a standby state, and transferring the pipe-shaped drilling device from the storage part to a height corresponding to the upper deck in a processing state; and a transfer member for transferring the pipe-shaped drilling device loaded on the storage part to the shielding unit when the shielding unit is positioned in the storage part.</p> |
申请公布号 |
KR20140120444(A) |
申请公布日期 |
2014.10.14 |
申请号 |
KR20130036097 |
申请日期 |
2013.04.03 |
申请人 |
SAMSUNG HEAVY IND. CO., LTD. |
发明人 |
PARK, JI SOON |
分类号 |
B63B35/44;B63B19/12;B63B27/16;E21B19/14 |
主分类号 |
B63B35/44 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|