发明名称 SKIDDING LOAD OUT METHOD FOR MARINE STRUCTURE
摘要 <p>In a method for loading an object (10) out from an inner wall (14) to a barge (16), the present invention comprises: a first step (S10) of installing a load sensor (25) in a skid shoe (20); a second step (S20) of checking whether the object (10) is in contact with the barge (16); and a third step (S30) of adjusting the ballast of the barge (16) corresponding to load variation while loading the object (10) out. Accordingly, the present invention can check whether an upper structure is in contact with the barge according to the detection of the load variation by directly installing a load cell in the offshore structure to be launched, and can precisely and safely launch the barge by determining whether the transmitted load value exceeds an allowable value while accurately monitoring the load value in real time.</p>
申请公布号 KR20140120082(A) 申请公布日期 2014.10.13
申请号 KR20130035715 申请日期 2013.04.02
申请人 DAEWOO SHIPBUILDING & MARINE ENGINEERING CO., LTD. 发明人 KIM, YOUNG WOO
分类号 B63C3/08;B63B9/06;B63C3/12 主分类号 B63C3/08
代理机构 代理人
主权项
地址