发明名称 METHODS FOR INITIATING NEW FRACTURES IN A COMPLETED WELLBORE HAVING EXISTING FRACTURES PRESENT THEREIN
摘要 Fracturing operations can be problematic in completed wellbores containing at least one existing fracture, since it can be difficult to seal an existing fracture and initiate a new fracture within a reasonable timeframe due to the presence of particulate materials in the wellbore. Methods for fracturing a completed wellbore can comprise introducing a treatment fluid comprising a plurality of degradable sealing particulates into a completed wellbore penetrating a subterranean formation having an existing fracture therein; sealing the existing fracture with at least a portion of the degradable sealing particulates, thereby forming a degradable particulate seal; after sealing, allowing any degradable sealing particulates remaining in the treatment fluid to degrade, such that the treatment fluid becomes substantially particulate free; and after the treatment fluid becomes substantially particulate free, fracturing the subterranean formation so as to introduce at least one new fracture therein.
申请公布号 EP2785813(A1) 申请公布日期 2014.10.08
申请号 EP20120780965 申请日期 2012.10.09
申请人 HALLIBURTON ENERGY SERVICES, INC. 发明人 TODD, BRADLEY, L.
分类号 C09K8/508;C09K8/035;C09K8/516;C09K8/62 主分类号 C09K8/508
代理机构 代理人
主权项
地址