摘要 |
PROBLEM TO BE SOLVED: To provide a technology capable of expecting an early measure for a secondary battery in which occurrence of component replacement is forecasted, while suppressing a load on a system.SOLUTION: A management system 1 comprises: a battery information collection section 2 for collecting battery information 31 that is information about a use history of an individual secondary battery 10; a battery information database 3 for storing battery information 31 collected by the battery information collection section 2; and an order entry information collection section 4 for collecting order entry information 82 that is information about component replacement of the secondary battery. The battery information 31 of a secondary battery 10 identified by the order entry information 82 is extracted from the battery information 31 stored in the battery information database 3. |