摘要 |
PROBLEM TO BE SOLVED: To provide a wet-curing method of a concrete structure side face in which an installation of a water retention mat and a wet-curing can be performed almost continuously to loosening a mold, and a continuous wet-curing can be performed right after the installation.SOLUTION: A wet-curing is performed by loosening a mold 12 in a removable time of the mold 12 (usually, 3-5 days after a day of installation), interposing a water retention mat 20, and flowing water in the water retention mat 20. |