发明名称 POWER MANAGEMENT SYSTEM, AND POWER MANAGEMENT METHOD
摘要 PROBLEM TO BE SOLVED: To rapidly and optimally decide such a compensation band where a peak power reduction amount becomes maximum to a given accumulator battery capacity.SOLUTION: A power management system 1 comprises: a load power acquisition part 20 acquiring past result data of a load power recorded while being associated with meteorological information similar to meteorological information of a control target day; a compensation band decision part 41 deciding a compensation frequency band of a stationary accumulator battery part 13 on the basis of the acquired past result data; and an accumulator battery controller 42 estimating the load power on the basis of the decided compensation frequency band of the accumulator battery and a total sum of a purchased power and an output of the stationary accumulator battery part 13, and controlling the output of the stationary accumulator battery part 13 on the basis of the estimated load power.
申请公布号 JP2014180134(A) 申请公布日期 2014.09.25
申请号 JP20130052494 申请日期 2013.03.14
申请人 SHIMIZU CORP 发明人 SUGIMOTO TAKAYUKI;SHIMODA EISUKE;YAMANE TOSHIHIRO;NUMATA SHIGEO
分类号 H02J3/00;H02J3/38 主分类号 H02J3/00
代理机构 代理人
主权项
地址