发明名称 Loading bridge for container loading of a cargo train on an electrified rail track
摘要 <p>The crane (1) has a horizontally movable sling part (14) moved and supported relative to a loading frame for gripping a seated container (2). The loading frame is moved at a level above the container and below a contact wire (5) of an overhead contact line system between a passage position and first and second loading positions in which the sling part is moved between the first loading position on the railway track and the second loading position centrally beneath the offloading portal, where the crane is unobstructed by passing a freight train part at the passage position.</p>
申请公布号 EP2781422(A1) 申请公布日期 2014.09.24
申请号 EP20140159909 申请日期 2014.03.14
申请人 SIEMENS AKTIENGESELLSCHAFT 发明人 MÜLLER, MANFRED LOTHAR;FAUBEL, PETER
分类号 B61B1/00;B66C17/20 主分类号 B61B1/00
代理机构 代理人
主权项
地址