发明名称 METHOD OF INCREASING OIL YIELD IN INHOMOGENEOUS, HIGHLY-FLOODED, POROUS AND FRACTURED-POROUS, LOW- AND HIGH-TEMPERATURE PRODUCTIVE STRATUM
摘要 FIELD: oil-and-gas industry.SUBSTANCE: proposed process comprises isolation of formation and bottom waters or annulus circulation. At insulation, water isolation polymer of loam-quartz system is injected into formation water saturated part while formation bottom zone and borehole are cemented by fast-setting plugging mix. In compliance with this invention, water isolation polymer of loam-quartz system is injected via tubing perforation below water-oil contact to create at extra shield in at least 20 mm from borehole. Said fast-setting plugging mix is injection via turning perforations above water-oil contact to make extra shield in at least 5 m from borehole. Productive bed oil-saturated interval is exposed by perforations in depth extending beyond contaminated zone boundaries. Said productive bed is re-exposed by hydrofrac or physical-chemical, wave, mechanical or acoustic effects.EFFECT: higher reliability of formation water isolation at minimum capital costs.4 dwg, 1 tbl
申请公布号 RU2528805(C1) 申请公布日期 2014.09.20
申请号 RU20130109861 申请日期 2013.03.05
申请人 APASOV GAJDAR TIMERGALEEVICH 发明人 APASOV GAJDAR TIMERGALEEVICH;APASOV TIMERGALEJ KABIROVICH;MUKHAMETSHIN VADIM GABDULOVICH;SAKHIPOV DAMIR MIDKHATOVICH;APASOV RENAT TIMERGALEEVICH
分类号 E21B43/22 主分类号 E21B43/22
代理机构 代理人
主权项
地址