发明名称 PROCEDE ET INSTALLATION DE PRODUCTION D'ENERGIE ELECTRIQUE D'APPOINT
摘要 <p>An installation for producing supplementary electrical energy for an electricity network includes at least first and second water reservoirs, the first water reservoir (311, 312) being situated at a first level and the second water reservoir (120) being situated at a second level lower than the first level, a communicating pipe (340) between the first water reservoir (311, 312) and the second water reservoir (120) being provided with a remote-controlled valve (350), and a hydro-electric generating system (330) being provided with a pumping installation. The first and/or second water reservoir (311, 312; 120) is integrated in the foundations in the lower portion of an artificial building (301, 303; 200A) that needs to be built for a primary function independently of a secondary function of producing electricity. The first water reservoir (315) or the second water reservoir (120) may constitute a common body of water in the vicinity of ground level. The water reservoirs (311, 312; 210; 220) integrated in foundations of buildings may in particular cooperate with installations for air-conditioning or heating the buildings at the base of which they are constructed, or associated buildings.</p>
申请公布号 FR2965310(B1) 申请公布日期 2014.09.19
申请号 FR20100057756 申请日期 2010.09.27
申请人 NATURE AND PEOPLE FIRST 发明人 PAYRE DENIS;PISTERMAN PIERRE;PISTERMAN PATRICE
分类号 F03B13/08;E04H7/02 主分类号 F03B13/08
代理机构 代理人
主权项
地址