发明名称 |
Manufacturing method of porous composite film |
摘要 |
The instant disclosure relates to a manufacturing method of a porous composite film. The manufacturing method includes processing a first porous film and a second porous film and includes the following steps: providing a pressing unit, a film-shaping unit, and a cooling unit; intersecting the first and second porous films at an angle; stacking the first and second porous films in forming a half-finished porous composite film; pressing the half-finished porous composite film by the pressing unit at a temperature T1 and under a tension S1; relieving the pressing force against the half-finished porous composite film thermally by the film-shaping unit at a temperature T2; and maintaining the half-finished porous composite film at a pre-determined tension by the cooling unit at a temperature T3. |
申请公布号 |
US8834656(B2) |
申请公布日期 |
2014.09.16 |
申请号 |
US201213616001 |
申请日期 |
2012.09.14 |
申请人 |
Entire Technology Co., Ltd. |
发明人 |
Chen Chien-Chih;Chang Yu-Wei;Yao Chia-Yin;Hsu Jui-Lin;Tsai Ming-Cheng |
分类号 |
B29C65/02;B32B37/16;B32B37/20;B32B43/00;C08J5/22 |
主分类号 |
B29C65/02 |
代理机构 |
Li & Cai Intellectual Property (USA) Office |
代理人 |
Li & Cai Intellectual Property (USA) Office |
主权项 |
1. A manufacturing method for a porous composite film having a pre-determined tension, by processing a first porous film and a second porous film, with the first porous film defining and being disposed along a first stretching direction, and the second porous film defining and being disposed along a second stretching direction, comprising the steps of:
providing a pressing unit, a film-shaping unit, and a cooling unit; arranging the first and the second porous films in a manner that the first stretching direction and the second stretching direction intersect at a predetermined angle; stacking the first porous film and the second porous film to form a half-finished porous composite film; pressing the half-finished porous composite film by the pressing unit at a temperature T1 under a tension S1; shaping the half-finished porous composite film by the film-shaping unit at a temperature T2 for thermally relieving the pressing force against the half-finished porous composite film; maintaining the half-finished porous composite film at a pre-determined tension S3 by the cooling unit at a temperature T3, wherein T3 satisfying the following condition:T1+T2+T3100*W1=1,wherein0.2<W1<0.5T2-T1T3-T1*W2=1,wherein0.02<W2<16. |
地址 |
Taoyuan County TW |