发明名称 Method for installing an operating rig for a fluidin a body of water with a traction unit
摘要 <p>This method comprises connecting a downstream point (40) of a pipe (24) to a buoy (26) and completely submerging the buoy (26). It comprises deploying in the body of water (12) an intermediate section (30) of the pipe (24) from the downstream point (40) to at least as far as an upstream point (38), anchoring the upstream point (38), and tensioning the intermediate section (30) to keep it vertical. The connecting step includes activating a traction unit (96) to raise the downstream point (40) on the buoy (26). During the connecting step, the buoy (26) is carried in the body of water (12) virtually exclusively by its own floatability.</p>
申请公布号 EG26777(A) 申请公布日期 2014.09.02
申请号 EG20110500701 申请日期 2011.05.05
申请人 TECHNIP FRANCE 发明人 REMERY JEROEN;VIVET ROMAIN;DEFRESLON CHRISTOPHE;LUPPI ANGE
分类号 E21B17/01;E21B43/013;F16L1/24 主分类号 E21B17/01
代理机构 代理人
主权项
地址