摘要 |
<p>The method of operation of a control device of an installation for a building, preferably tertiary, whose control device comprises at least one first interface (7) configured in such a way as to be associated with a sunshine sensor (2), a clock (3) associated with a temporal data reference and at least one second interface (8) configured in such a way as to be associated with an item of equipment (4) intended to be driven as a function of a temporal value emanating from the clock (3), comprises a step (E1) of adjusting the reference of the clock (3) on the basis of at least one data item related to a sunshine measurement (2).</p> |