摘要 |
PROBLEM TO BE SOLVED: To provide structure and a construction method for repairing and reinforcing an existing steel girder, which are expected to exert a suppression effect on both of in-plane bending and out-of-plane bending.SOLUTION: Structure for repairing and reinforcing a vertical-girder and cross-girder joint of an existing steel girder, employs composite structure in which a vertical-girder web end is integrated by reinforced concrete 5. As a result, rigidity on the periphery of a region that becomes a source causing a fatigue crack is enhanced, so that the occurrence of in-plane bending and out-of-plane bending are suppressed. |