摘要 |
A method in an Ethernet Bridge for improved load distribution in an Ethernet network that includes the Ethernet Bridge including determining a first set of one or more shortest paths between each Ethernet Bridge pair in the Ethernet network, selecting at least a first shortest path, calculating a link utilization value for each link of the Ethernet network, determining a second set of one or more shortest paths between each Ethernet Bridge pair in the Ethernet network, generating a path utilization value for each shortest path, selecting a second shortest path on the basis of said path utilization value, whereby the selection of the second shortest in light of path utilization minimizes the standard deviation of load distribution across the entire Ethernet network. |