摘要 |
FIELD: mining.SUBSTANCE: proposed method comprises drilling the vertical wells, charging the latter, placing the charges, short-delay blasting of said wells and selective excavation. Blasting of blocks is performed in bulk. Note here that all three dimensions of blasted block, i.e. width, length and height, are set irrespective of the position of contacts and the number of ore bodies. After block blasting, portion of shotpile is dumped over slope roof with working of the first pass over rock on the side of ore body hanging side. Depending on attitude of ore body in blasted block, selective working of productive bench is performed in two sub-benches with mining in layers.EFFECT: decreased losses of ore and ore dilution.1 dwg |