摘要 |
A method of installing a solar panel mounting stand, the method including: forming an installation scheduled surface on which a plurality of piles are scheduled to be installed at a position deeper than an original ground surface, by digging the soil of an installation site of the solar panel mounting stand; installing the plurality of piles at the installation site by supporting the plurality of piles in a state of being relatively aligned, using a pile installation structure, and transporting the plurality of piles to the installation site of the solar panel mounting stand integrally with the pile installation structure, and placing the projecting portions on the installation scheduled surface corresponding to each projecting portion, and refilling the installation site with soil; removing the pile installation structure from the plurality of piles; and assembling a member as a framework of the solar panel mounting stand, using the plurality of piles. |
主权项 |
1. A method of installing a solar panel mounting stand using a pile as a supporting leg, the pile comprising: a columnar pile body, at least a lower end side thereof being buried in the soil when a solar panel mounting stand equipped with a plurality of supporting legs is installed on the ground; and a non-spiral-shaped projecting portion provided at a lower end of the pile body in a state projected in a radial direction of the pile body
and configured to inhibit a pull-off of the pile body under a load of the soil when the lower end side of the pile body is embedded in the soil; the method comprising: a first step of forming an installation scheduled surface on which the plurality of piles are scheduled to be installed at a position deeper than an original ground surface, by digging the soil of an installation site of the solar panel mounting stand; a second step of installing the plurality of piles at the installation site by supporting the plurality of piles in a state of being relatively aligned, using a pile installation structure, and while maintaining such a supporting state, transporting the plurality of piles to the installation site of the solar panel mounting stand integrally with the pile installation structure, and placing the projecting portions, which are formed at lower ends of the plurality of piles, on the installation scheduled surface corresponding to each projecting portion, and thereafter refilling the installation site with soil; a third step of removing the pile installation structure from the plurality of piles; and a fourth step of assembling a member as a framework of the solar panel mounting stand, using the plurality of piles. |